17 resultados para Process planning

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Offset printing is a common method to produce large amounts of printed matter. We consider a real-world offset printing process that is used to imprint customer-specific designs on napkin pouches. The production equipment used gives rise to various technological constraints. The planning problem consists of allocating designs to printing-plate slots such that the given customer demand for each design is fulfilled, all technological and organizational constraints are met and the total overproduction and setup costs are minimized. We formulate this planning problem as a mixed-binary linear program, and we develop a multi-pass matching-based savings heuristic. We report computational results for a set of problem instances devised from real-world data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Robust and accurate identification of intervertebral discs from low resolution, sparse MRI scans is essential for the automated scan planning of the MRI spine scan. This paper presents a graphical model based solution for the detection of both the positions and orientations of intervertebral discs from low resolution, sparse MRI scans. Compared with the existing graphical model based methods, the proposed method does not need a training process using training data and it also has the capability to automatically determine the number of vertebrae visible in the image. Experiments on 25 low resolution, sparse spine MRI data sets verified its performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reducing Emissions from Deforestation and Forest Degradation and enhancing forest carbon stocks (REDD+) is a performance-based payment mechanism currently being debated in international and national environmental policy and planning forums. As the mechanism is based on conditionality, payments must reflect land stewards’ level of compliance with carbon-efficient management practices. However, lack of clarity in land governance and carbon rights could undermine REDD+ implementation. Strategies are needed to avoid perverse incentives resulting from the commoditization of forest carbon stocks and, importantly, to identify and secure the rights of legitimate recipients of future REDD+ payments. We propose a landscape-level approach to address potential conflicts related to carbon tenure and REDD+ benefit sharing. We explore various land-tenure scenarios and their implications for carbon ownership in the context of a research site in northern Laos. Our case study shows that a combination of relevant scientific tools, knowledge, and participatory approaches can help avoid the marginalization of rural communities during the REDD+ process. The findings demonstrate that participatory land-use planning is an important step in ensuring that local communities are engaged in negotiating REDD+ schemes and that such negotiations are transparent. Local participation and agreements on land-use plans could provide a sound basis for developing efficient measurement, reporting, and verification systems for REDD+.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVES To evaluate prosthetic parameters in the edentulous anterior maxilla for decision making between fixed and removable implant prosthesis using virtual planning software. MATERIAL AND METHODS CT- or DVT-scans of 43 patients (mean age 62 ± 8 years) with an edentulous maxilla were analyzed with the NobelGuide software. Implants (≥3.5 mm diameter, ≥10 mm length) were virtually placed in the optimal three-dimensional prosthetic position of all maxillary front teeth. Anatomical and prosthetic landmarks, including the cervical crown point (C-Point), the acrylic flange border (F-Point), and the implant-platform buccal-end (I-Point) were defined in each middle section to determine four measuring parameters: (1) acrylic flange height (FLHeight), (2) mucosal coverage (MucCov), (3) crown-Implant distance (CID) and (4) buccal prosthesis profile (ProsthProfile). Based on these parameters, all patients were assigned to one of three classes: (A) MucCov ≤ 0 mm and ProsthProfile≥45(0) allowing for fixed prosthesis, (B) MucCov = 0-5 mm and/or ProsthProfile = 30(0) -45(0) probably allowing for fixed prosthesis, and (C) MucCov ≥ 5 mm and/or ProsthProfile ≤ 30(0) where removable prosthesis is favorable. Statistical analyses included descriptive methods and non-parametric tests. RESULTS Mean values were for FLHeight 10.0 mm, MucCov 5.6 mm, CID 7.4 mm, and ProsthProfile 39.1(0) . Seventy percent of patients fulfilled class C criteria (removable), 21% class B (probably fixed), and 2% class A (fixed), while in 7% (three patients) bone volume was insufficient for implant planning. CONCLUSIONS The proposed classification and virtual planning procedure simplify the decision-making process regarding type of prosthesis and increase predictability of esthetic treatment outcomes. It was demonstrated that in the majority of cases, the space between the prosthetic crown and implant platform had to be filled with prosthetic materials.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An Advanced Planning System (APS) offers support at all planning levels along the supply chain while observing limited resources. We consider an APS for process industries (e.g. chemical and pharmaceutical industries) consisting of the modules network design (for long–term decisions), supply network planning (for medium–term decisions), and detailed production scheduling (for short–term decisions). For each module, we outline the decision problem, discuss the specifi cs of process industries, and review state–of–the–art solution approaches. For the module detailed production scheduling, a new solution approach is proposed in the case of batch production, which can solve much larger practical problems than the methods known thus far. The new approach decomposes detailed production scheduling for batch production into batching and batch scheduling. The batching problem converts the primary requirements for products into individual batches, where the work load is to be minimized. We formulate the batching problem as a nonlinear mixed–integer program and transform it into a linear mixed–binary program of moderate size, which can be solved by standard software. The batch scheduling problem allocates the batches to scarce resources such as processing units, workers, and intermediate storage facilities, where some regular objective function like the makespan is to be minimized. The batch scheduling problem is modelled as a resource–constrained project scheduling problem, which can be solved by an efficient truncated branch–and–bound algorithm developed recently. The performance of the new solution procedures for batching and batch scheduling is demonstrated by solving several instances of a case study from process industries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PURPOSE This paper describes the development of a forward planning process for modulated electron radiotherapy (MERT). The approach is based on a previously developed electron beam model used to calculate dose distributions of electron beams shaped by a photon multi leaf collimator (pMLC). METHODS As the electron beam model has already been implemented into the Swiss Monte Carlo Plan environment, the Eclipse treatment planning system (Varian Medical Systems, Palo Alto, CA) can be included in the planning process for MERT. In a first step, CT data are imported into Eclipse and a pMLC shaped electron beam is set up. This initial electron beam is then divided into segments, with the electron energy in each segment chosen according to the distal depth of the planning target volume (PTV) in beam direction. In order to improve the homogeneity of the dose distribution in the PTV, a feathering process (Gaussian edge feathering) is launched, which results in a number of feathered segments. For each of these segments a dose calculation is performed employing the in-house developed electron beam model along with the macro Monte Carlo dose calculation algorithm. Finally, an automated weight optimization of all segments is carried out and the total dose distribution is read back into Eclipse for display and evaluation. One academic and two clinical situations are investigated for possible benefits of MERT treatment compared to standard treatments performed in our clinics and treatment with a bolus electron conformal (BolusECT) method. RESULTS The MERT treatment plan of the academic case was superior to the standard single segment electron treatment plan in terms of organs at risk (OAR) sparing. Further, a comparison between an unfeathered and a feathered MERT plan showed better PTV coverage and homogeneity for the feathered plan, with V95% increased from 90% to 96% and V107% decreased from 8% to nearly 0%. For a clinical breast boost irradiation, the MERT plan led to a similar homogeneity in the PTV compared to the standard treatment plan while the mean body dose was lower for the MERT plan. Regarding the second clinical case, a whole breast treatment, MERT resulted in a reduction of the lung volume receiving more than 45% of the prescribed dose when compared to the standard plan. On the other hand, the MERT plan leads to a larger low-dose lung volume and a degraded dose homogeneity in the PTV. For the clinical cases evaluated in this work, treatment plans using the BolusECT technique resulted in a more homogenous PTV and CTV coverage but higher doses to the OARs than the MERT plans. CONCLUSIONS MERT treatments were successfully planned for phantom and clinical cases, applying a newly developed intuitive and efficient forward planning strategy that employs a MC based electron beam model for pMLC shaped electron beams. It is shown that MERT can lead to a dose reduction in OARs compared to other methods. The process of feathering MERT segments results in an improvement of the dose homogeneity in the PTV.